You must enable JavaScript to see certain information on this page.
THE NATURIST LEGACY FILES
PHOTOS
Small water and waste projects
With most of the underground wiring trenches filled in, we turned our attention to burying the water line that would connect the new well with the yet-to-be-built washroom building, clubhouse and RV sanitary dump station. Part of the new water line would be buried under locations that would occasionally receive heavy vehicle traffic so we took the precaution of protecting our flexible 1" polyethylene water pipe with rigid 2" ABS pipe in those areas. Excess water pipe was coiled near where the washroom building would soon be constructed. Around this same time we were able to capitalize on a convenient opportunity to obtain a small amount of ready-mixed concrete for our RV sanitary dump station. I and a fellow director quickly built forms and added reinforcing steel. We were ready just in time to level and trowel the concrete when it arrived. With these jobs done, two more small but important construction and development projects could be crossed off Naturist Legacy Park's 2011 task list (PDF)!These photographs from my personal collection were taken in July and August 2011. Click or tap below to view larger photos.
Winnipeg Manitoba nudist naturist nudism naturism